Uploaded on Nov 22, 2026
Moving into new residential projects in borivali? Learn what you can change after possession and what needs society permission. For more info - go to https://www.bhatiabuilders.com/projects/auriga-9
Renovation Rules in a New Building What Borivali Owners Can and Cannot Change After Possession
--- Page 1 ---
Renovation Rules in a New Building: What Borivali
Owners Can and Cannot Change After Possession
Quick answer: In a new apartment building you can usually change interiors such as paint, flooring,
furniture and false ceilings, but not structural walls, external appearance or common services. Always
check the society's rules, timings, deposits and permissions before starting work.
Most owners want to personalise a new flat. But in a shared building, your changes can affect
neighbours and the structure. If you are moving into one of the new residential projects in borivali,
here is what to know first.
Usually allowed
Painting and wall finishes
Changing flooring, within weight and waterproofing limits
Modular kitchen and wardrobes
False ceilings and lighting
Non-structural partitions, with permission
Curtains, blinds and furniture
Usually restricted
Removing or cutting structural walls, beams or columns
Changing external elevation, window frames or balcony railings
Moving plumbing shafts or drainage lines
Closing a deck or balcony without approval
Placing AC units where the society has not allowed
Usually needing permission
Changes to bathrooms and waterproofing
Electrical load increases
Gas line changes
Large furniture lifts using the service lift
Step 1: Read the rules
Ask the society for the renovation policy. It may cover permitted hours, noise limits, debris disposal,
contractor entry and deposits.
Step 2: Choose a reliable contractor
Bhatia Builders
bhatiabuilders.com | Real Estate Developer in Mumbai
--- Page 2 ---
Check past work and references
Ask for a written quote and timeline
Confirm insurance and safety practice
Register workers with the society
Step 3: Protect common areas
Use covers for lift walls and floors, and clean up daily. Damage to common areas may be charged to
you.
Step 4: Waterproofing
Never disturb bathroom waterproofing without proper treatment. Leaks can affect the flat below and
cause disputes.
Step 5: Keep records
Photos before and after
Permission letters
Bills and warranties
Drawings of concealed pipes and wires
Timing and neighbours
Noisy work usually has fixed hours. Inform neighbours in advance, and avoid festival days and exam
seasons.
Warranty note
Check how renovation affects the developer's warranty. Structural or waterproofing changes may
reduce your protection.
Budget tips
Add a buffer of 10 to 15 percent for surprises. Delays and hidden work can raise costs.
FAQs
Can I break a wall? Not if it is structural. Ask an engineer and the society.
Can I change the tiles? Usually yes, but follow weight and waterproofing advice.
Do I need to inform the society? Yes, for almost all work.
Bhatia Builders
bhatiabuilders.com | Real Estate Developer in Mumbai
--- Page 3 ---
What if a neighbour complains? Follow the rules and resolve it politely through the committee.
Final thoughts
Renovation is easier when you respect the building. Read rules, hire carefully and keep neighbours
informed. As you choose among the new residential projects in borivali, ask about renovation policy
early.
This is general information. Please confirm rules with the developer and the society.
Bhatia Builders
bhatiabuilders.com | Real Estate Developer in Mumbai
Comments