Uploaded on Jul 18, 2025
Discover how Brick & Bolt, India’s leading tech-enabled construction platform, uses AI, automation, and real-time project tracking to eliminate delays, streamline approvals, and deliver homes on time with superior quality and transparency.
How Brick & Bolt Uses Technology to Avoid Project Delays
How Brick &
Bolt Uses
Technology to
Avoid Project
Delays
The Problem – Project Delays in Construction
• In the construction industry, delays are extremely
common and lead to significant consequences:
• Cost overruns increase financial burden for clients.
• Customer dissatisfaction arises due to unmet
expectations.
• Loss of trust between clients, contractors, and vendors.
• In residential construction, the impact is more personal—
homeowners often invest their life savings and emotional
energy into building a dream home.
• Traditional construction methods lack real-time visibility,
efficient communication, and predictive planning, which
leads to avoidable delays.
Brick & Bolt – A Tech-Enabled Solution
• Brick & Bolt is India’s first tech-enabled construction platform.
• The company aims to modernize construction by embedding
smart technology at every stage.
• It uses:
• Automation to streamline tasks.
• AI & Machine Learning for predictive planning.
• Cloud-based tools for real-time collaboration.
• Integrated project management systems for end-to-end control.
• These tools help avoid delays and bring predictability,
transparency, and efficiency into the construction process.
1. Real-Time Project Tracking System
• Brick & Bolt uses a live project tracking dashboard to monitor
every aspect of a site’s progress.
• Project managers and clients can see:
• Daily work status
• Labor allocation
• Material consumption
• This eliminates dependence on manual reports or site visits,
which often delay issue detection.
• Impact:
• Improved project tracking leads to a 25–30% increase in
schedule adherence.
• Teams can spot and fix issues early, avoiding costly setbacks.
2. Predictive AI That Flags Potential Delays
• Brick & Bolt uses AI and machine learning to analyze data from
past and ongoing projects.
• The system learns patterns and predicts where delays are
likely to occur, such as:
• Delayed vendor deliveries
• Weather disruptions
• Labor absenteeism
• Complicated design approvals
• Once a potential delay is flagged, the platform recommends
corrective steps, like:
• Ordering materials in advance.
• Rescheduling labor tasks.
• Fast-tracking approval processes.
• Impact:
• Predictive planning has cut unplanned downtime by over 35%.
3. Automated Quality Inspections with Image
Re• cPoogorn iwtoiorknmanship leads to rework, which can significantly
delay construction.
• Brick & Bolt tackles this using image recognition technology:
⚬ High-resolution site images are analyzed by AI.
⚬ The system detects flaws such as:
■ Misaligned walls
■ Improper plastering
■ Incorrect beam placements
• Issues are flagged within hours, allowing for quick corrections
without waiting for a manual check.
• Impact:
⚬ Projects using this method saw a 20–25% reduction in
rework time.
4. Digital Approvals and Documentation Flow
• In traditional setups, getting approval from clients or architects
is time-consuming, involving:
⚬ Long meetings
⚬ Repeated phone calls
⚬ Paper-based documentation
• Brick & Bolt digitizes the entire approval process:
⚬ Design changes, upgrades, or layout modifications are
raised via app.
⚬ Clients can approve instantly from anywhere using the app
or email.
• Impact:
⚬ Approval time has been reduced by 50–60%, accelerating
project speed.
5. Automated Vendor Coordination and Material
Management
• One of the top causes of delays is material shortage or late
delivery.
• Brick & Bolt’s platform uses a dynamic inventory system
synced with vendor networks.
• When material stocks run low or a stage is upcoming, the
system:
• Auto-triggers procurement orders
• Contacts pre-approved vendors
• Ensures delivery happens just in time
• Impact:
• This smart procurement model led to a 40%+ reduction in
material-related delays.
6. Digital Work Allocation and Team Coordination
• Traditionally, construction teams rely on paper-based task lists
or verbal instructions.
• Brick & Bolt improves this by using a centralized digital system:
• Daily tasks are assigned through mobile apps.
• Site supervisors and teams receive clear instructions and
timelines.
• If a task is delayed, the system instantly escalates the issue.
• Overlapping tasks are automatically rescheduled to avoid idle
labor.
• Impact:
• Task execution accuracy improved by up to 30%.
• Resource wastage significantly reduced.
7. Centralized Communication with Clients and
Te•aCmonsstruction involves multiple stakeholders clients, engineers,
architects, vendors.
• Brick & Bolt brings all communication to one centralized
platform:
• Site images, payment records, design approvals, and queries
are all logged digitally.
• Reduces confusion and miscommunication.
• Everyone stays on the same page, leading to quicker issue
resolution.
• Impact:
• Drastic drop in customer complaints.
• Faster decision-making and higher client satisfaction.
Tech-Driven Results
• Brick & Bolt’s smart systems deliver:
⚬ Seamless project execution
⚬ On-time delivery with fewer surprises
⚬ Superior quality control
⚬ Transparent tracking and reporting
• Their tech-first approach is redefining standards in India’s
construction industry, especially in residential housing.
Conclusion
• Construction delays are no longer inevitable.
• With the use of:
⚬ AI-powered scheduling
⚬ Real-time dashboards
⚬ Automated inspections
⚬ Smart procurement
• Brick & Bolt has created a modern, efficient, and reliable
construction process.They are setting new benchmarks for
building homes in India—faster, better, and smarter.
Comments