MEP systems constitute a major part of buildings and structures in terms of usage, cost, and time. BIM coordination services assist MEP contractors with accurate spatial coordination, exhaustive clash detection, precise documentation, quick project delivery, etc. Construction delays can be reduced by 40% to attain greater project performance and efficiency with clash-free MEP BIM models. Check out this PPT to learn the benefits of BIM coordination services and the need for MEP contractors to adopt them.
Why do MEP contractors require BIM coordination services?
Your Partner in Process Excellence Why do contractors require
MEP coordination services?
Challenges faced by MEP contractors
Inaccurate MEP designs leading to rework
Errors during onsite installation due to unidentified clashes
Low level of detailing due to uncoordinated 2D drawings &
sketches
Meeting tight deadlines and controlling building costs
Undetected clashes account for 5% of total construction spend
(Source: Autodesk)
How MEP coordination services benefit MEP contractors
Early conflict Provide Help meet Stay within
resolution hassle-free project planned budget
in MEP designs onsite installation deadlines
with spatially with proper by reducing with high level of
coordinated models scheduling & planning unnecessary reworkdetailing
1 Clash identification & resolution at preconstruction stage
Problem The MEP BIM Solution
Onsite interdisciplinary MEP clashes leading to : Early clash identification and resolution
Rework due to undetected clashes Better visualization of MEP systems
Lack of visualization Dynamic collaboration between various MEP trades
Silo workflows Interdisciplinary coordinated workflows
Errors during onsite installation Covers 100% installation accuracy of MEP systems
2 Address MEP design conflicts at design stage
Problem The MEP BIM Solution
Constructability issues lead to: Data-rich and coordinated MEP models
lack of spatial coordination Real-time visualization of MEP systems
Absence of constructability analysis Better routing of MEP systems
Performance issues of MEP systems
3 Better scheduling with improved workflows
Problem The MEP BIM Solution
Conflicts in workflow and equipment scheduling Precise material and equipment scheduling
due to Accurate 4D scheduling and construction sequencing
Timeline conflicts and inaccurate material scheduling Real-time walkthroughs of MEP systems
workflow issues cascaded to next design phase
Ad-hoc site downtimes
$7M saved by a General Contracting
company for an airport project in
Oman, with MEP clash detection and
coordination services.
Want to know how?
Learn how BIM MEP Clash Detection for International Airport
Get a higher ROI for your construction project
with effective MEP coordination services.
Contact our MEP experts today!