The process involves various type of tests carried out as per the protocol specifically prepared of reach equipment and client. Irrespective of model and type of the tested piece, the protocol need to be specifically prepared for each device and to be tested separately. Visit here- https://www.temperaturemonitoringuae.com/
Temperature Qualification
Temperature Qualification
Vacker -
Temperature Monitoring Sol
utions
What is the Difference between the Mapping study and Qualification?
This is often a subject of confusion which we will
like to clarify. In brief terms, qualification is a
much more elaborate process than a mapping
study. A mapping study only analyzes the
distribution of temperature and humidity (if
applicable). The result will show whether the
distribution is uniform. Mapping study is only
one part of the qualification process. The
qualification procedure has a lot of other
verification and tests.
Temperature Qualification Process
• The process involves various type of tests carried
out as per the protocol specifically prepared of
reach equipment and client. Irrespective of
model and type of the tested piece, the protocol
need to be specifically prepared for each device
and to be tested separately.
1. Design Qualification (DQ)
The design of the equipment should be adequate to
achieve the desired results. The results are not to be
defined by the installed equipment. eg. A cold room
should maintain a temperature of 2 to 8 Deg Celcius for
keeping medicines. Here the desired result is that the
temperature should always be within these limits. Hence
all the installed equipment should be suitably designed
to ensure the same.
2. Installation Qualification (IQ)
This process involves various checking to test
I. Various components are properly calibrated
periodically.
II. The equipment is properly maintained as per the
recommendations of the manufacturer.
III. Check whether the client operates the equipment as
per the recommended procedures of the
manufacturer.
3. Operational Qualification (OQ)
• This procedure involves checking all aspects affecting the operations of
the equipment. Among various other tests, this involves checking
various controlling instruments of the asset to ensure that the asset can
be properly controlled. eg. a Thermostat of a freezer is a controlling
instrument, which if not working properly will affect the operation of
the asset.
4. Performance Qualification (PQ)
• The performance of the equipment varies as per the distribution and
the type of material kept inside the area. Hence it is important to test
the equipment under all such circumstances. The whole process will
involve rigorous testing for extreme conditions to ensure the reliability
of the same.