Uploaded on Nov 28, 2026
Caterpillar Cat CS76 XT CP76 Vibratory Compactor (Prefix CYX) Service Repair Manual Instant Download (CYX00001 and up)
Caterpillar Cat CS76 XT CP76 Vibratory Compactor (Prefix CYX) Service Repair Manual Instant Download (CYX00001 and up)
--- Page 1 ---
Product: VIBRATORY COMPACTOR
Model: CS-76 VIBRATORY COMPACTOR CYX
Configuration: CS76 XT CP76 Vibratory Compactor CYX00001-UP (MACHINE) POWERED BY C6.6 Engine
Disassembly and Assembly
C6.6 Engines for Caterpillar Built Machines
Media Number -KENR6081-15
Publication Date -01/03/2014
Date Updated -04/03/2014
i05735238
Idler Gear - Install
SMCS - 1206-012
Installation Procedure (Standard Idler Gear)
Table 1
Required Tools
Tool
Part Number
Part Description
Qty
A
230-6284
Timing Pin (Camshaft)
1
B
136-4632
Timing Pin (Crankshaft)
1
268-1966
Adapter
1
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
1. Ensure that number one piston is at top dead center on the compression stroke. Refer to
System Operation, Testing and Adjusting, "Finding Top Center for No. 1 Piston" for the
correct procedure.
--- Page 2 ---
Illustration 1
g01337918
Alignment of timing marks
2. Ensure that Tooling (A) is installed into Hole (X) in camshaft gear (1).
Illustration 2
g01337947
3. Ensure that Tooling (B) is installed in Hole (Y) in the cylinder block. Use Tooling (B) in
order to lock the crankshaft in the correct position. Refer to System Operation, Testing and
Adjusting, "Finding Top Center Position for No.1 Piston" for the correct procedure.
--- Page 3 ---
Illustration 3
g01337949
4. Clean idler gear (2) and inspect the idler gear for wear or damage. Refer to Specifications,
"Gear Group (Front)" for more information. If necessary, replace the idler gear.
5. Clean hub (7) and inspect the hub for wear or damage. Refer to Specifications, "Gear Group
(Front)" for more information. If necessary, replace the hub.
6. Lubricate hub (7) with clean engine oil. Slide hub (7) into idler gear (2). Ensure that the
timing marks are toward the front of the idler gear.
--- Page 4 ---
https://www.ebooklibonline.com
Hello dear friend!
Thank you very much for reading.
Enter the link into your browser.
The full manual is available for immediate
download.
https://www.ebooklibonline.com
--- Page 5 ---
Illustration 4
g01337952
7. Align the timing mark on idler gear (2) with the timing mark on the camshaft gear. Refer to
the illustration 1. Install the assembly of idler gear (2) and hub (7) into the recess in the
timing case. Ensure that oil Hole (Z) is to the top of the hub.
Note: The idler gear must be tilted during installation. Ensure that the holes in the hub are
aligned with the holes in the cylinder block.
8. Clean plate (3) and inspect the plate for wear or damage. If necessary, replace the plate.
9. Lubricate plate (3) with clean engine oil. Align the holes in plate (3) with the holes in hub
(7). Install the plate in the original orientation.
10. Install bolts (1).
11. Remove Tooling (A) and Tooling (B).
Note: Ensure that timing marks are aligned, before removing the Tooling (A) and Tooling
(B).
12. Install plug (8) to the cylinder block. Refer to Illustration 2.
13. Tighten bolts (1) to a torque of 44 N·m (32 lb ft).
--- Page 6 ---
Illustration 5
g01337953
Checking end play by using a set of feeler gauge's
14. Use a set of feeler gauge's in order to check the end play for the idler gear. Refer to
Specifications, "Gear Group (Front)" for more information.
Illustration 6
g01335426
Checking backlash
--- Page 7 ---
15. Check the backlash between the idler gear and the camshaft gear. Refer to Specifications,
"Gear Group (Front)" for more information.
16. Check the backlash between the idler gear and the crankshaft gear. Refer to Specifications,
"Gear Group (Front)" for more information.
17. Lightly lubricate all of the gears with clean engine oil.
End By:
a. Install the fuel injection pump gear. Refer to Disassembly and Assembly, "Fuel Pump Gear
- Install" for the correct procedure.
Installation Procedure (Early Heavy-Duty Idler Gear)
Table 2
Required Tools
Tool
Part Number
Part Description
Qty
A
230-6284
Timing Pin (Camshaft)
1
B
136-4632
Timing Pin (Crankshaft)
1
268-1966
Adapter
1
C
9U-7324
Indicator Bracket
1
7H-1942
Dial Indicator
1
3S-3268
Indicator Contact Point
1
7H-1940
Universal Attachment
1
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
1. Ensure that number one piston is at top dead center on the compression stroke. Refer to
System Operation, Testing and Adjusting, "Finding Top Center for No. 1 Piston" for the
correct procedure.
--- Page 8 ---
Illustration 7
g01337924
Alignment of timing marks
2. Ensure that Tooling (A) is installed into Hole (X) in the camshaft gear.
Illustration 8
g01337954
3. Ensure that Tooling (B) is installed in Hole (Y) in the cylinder block. Use Tooling (B) in
order to lock the crankshaft in the correct position. Refer to System Operation, Testing and
Adjusting, "Finding Top Center Position for No.1 Piston" for the correct procedure.
4. Clean the assembly of idler gear (2) and inspect the assembly of the idler gear for wear or
damage. Refer to Specifications , "Gear Group (Front)" for more information. If necessary,
replace the assembly of the idler gear.
5. Lubricate the bearings in the assembly of idler gear (2) with clean engine oil.
--- Page 9 ---
Illustration 9
g01337922
6. Align the timing mark on idler gear (2) with the timing mark on the camshaft gear. Refer to
the illustration 7. Install the assembly of idler gear (2) into the recess in the timing case.
Ensure that the identification mark TOP is upward.
Note: The idler gear must be tilted during installation. Ensure that the holes in assembly of
the idler gear are aligned with the holes in the cylinder block.
7. Install bolts (1).
8. Remove Tooling (A) and Tooling (B).
Note: Ensure that timing marks are aligned, before removing the Tooling (A) and Tooling
(B).
9. Install plug (6) to the cylinder block. Refer to Illustration 8.
10. Tighten bolts (1) to a torque of 44 N·m (32 lb ft).
--- Page 10 ---
Illustration 10
g01337957
11. Use Tooling (C) in order to check the end play for the heavy-duty idler gear. Refer to
Specifications, "Gear Group (Front)" for more information.
Illustration 11
g01335426
Checking backlash
--- Page 11 ---
12. Check the backlash between the idler gear and the camshaft gear. Refer to Specifications,
"Gear Group (Front)" for more information.
13. Check the backlash between the idler gear and the crankshaft gear. Refer to Specifications,
"Gear Group (Front)" for more information.
14. Lightly lubricate all of the gears with clean engine oil.
End By:
a. Install the fuel injection pump gear. Refer to Disassembly and Assembly, "Fuel Pump Gear
- Install" for the correct procedure.
Installation Procedure (Latest Heavy-Duty Idler Gear)
Table 3
Required Tools
Tool
Part Number
Part Description
Qty
A
230-6284
Timing Pin (Camshaft)
1
B
136-4632
Timing Pin (Crankshaft)
1
268-1966
Adapter
1
C
9U-7324
Indicator Bracket
1
7H-1942
Dial Indicator
1
3S-3268
Indicator Contact Point
1
7H-1940
Universal Attachment
1
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
1. Ensure that number one piston is at the top center Position on the compression stroke. Refer
to Systems Operation, Testing and Adjusting, "Finding Top Center Postion for No. 1
Piston" for the correct procedure.
--- Page 12 ---
Illustration 12
g01343977
Alignment of timing marks
2. Ensure that Tooling (A) is installed into Hole (X) in the camshaft gear.
3. Ensure that Tooling (B) is installed in Hole (Y) in the cylinder block. Use Tooling (B) in
order to lock the crankshaft in the correct position. Refer to Systems Operation, Testing and
Adjusting, "Finding Top Center Position for No.1 Piston" for the correct procedure.
--- Page 13 ---
Illustration 13
g01387344
Typical example
4. Install plate (6) into the recess in the front housing.
Note: Ensure that the identification mark TOP is upward.
5. Clean the assembly of idler gear (2) and inspect the assembly of the idler gear for wear or
damage. Refer to Specifications, "Gear Group (Front)" for more information. If necessary,
replace the assembly of the idler gear.
6. Lubricate the bearings in the assembly of idler gear (2) with clean engine oil.
Illustration 14
g01269933
7. Align the timing mark on idler gear (2) with the timing mark on the camshaft gear. Refer to
Illustration 12. Install the assembly of idler gear (2) into the recess in the timing case.
Ensure that the identification mark TOP is upward.
Note: The idler gear must be tilted during installation. Ensure that the holes in the assembly
of the idler gear are aligned with the holes in the cylinder block.
8. Install bolts (1). Tighten bolts (1) to a torque of 44 N·m (32 lb ft).
--- Page 14 ---
Illustration 15
g01269937
Checking end play by using a dial indicator group
9. Use Tooling (C) in order to check the end play of the idler gear. Refer to Specifications,
"Gear Group (Front)" for more information.
10. Use Tooling (C) in order to check the backlash between the idler gear and the camshaft
gear. Refer to Specifications, "Gear Group (Front)" for more information.
11. Use Tooling (C) in order to check the backlash between the idler gear and the crankshaft
gear. Refer to Specifications, "Gear Group (Front)" for more information.
12. Lightly lubricate all of the gears with clean engine oil.
End By:
a. Install the fuel injection pump gear. Refer to Disassembly and Assembly, "Fuel Pump Gear
- Install" for the correct procedure.
b. If the engine is equipped with an air compressor, install the air compressor. Refer to
Disassembly and Assembly, "Air Compressor - Remove and Install" for the correct
procedure.
c. If the engine is equipped with an accessory drive, install the accessory drive. Refer to
Disassembly and Assembly, "Accessory Drive - Remove and Install" for the correct
procedure.
--- Page 15 ---
Product: VIBRATORY COMPACTOR
Model: CS-76 VIBRATORY COMPACTOR CYX
Configuration: CS76 XT CP76 Vibratory Compactor CYX00001-UP (MACHINE) POWERED BY C6.6 Engine
Disassembly and Assembly
C6.6 Engines for Caterpillar Built Machines
Media Number -KENR6081-15
Publication Date -01/03/2014
Date Updated -04/03/2014
i02786790
Housing (Front) - Remove
SMCS - 1151-011
Removal Procedure
Start By:
a. Remove the fan. Refer to Disassembly and Assembly, "Fan - Remove and Install".
b. If necessary, remove the alternator. Refer to Disassembly and Assembly, "Alternator -
Remove".
c. Remove the front pulley. Refer to Disassembly and Assembly, "Vibration Damper and
Pulley - Remove".
d. Remove the engine oil pan. Refer to Disassembly and Assembly, "Engine Oil Pan -
Remove".
e. If the engine has an accessory drive, remove the accessory drive. Refer to Disassembly and
Assembly, "Accessory Drive - Remove and Install".
f. Drain the coolant into a suitable container for storage or disposal. Refer to Operation and
Maintenance Manual, "Cooling System Coolant - Drain" for the correct procedure.
g. Remove the timing gears. Refer to Disassembly and Assembly, "Gear Group (Front) -
Remove and Install".
h. Remove the fuel injection pump. Refer to Disassembly and Assembly, "Fuel Injection Pump
- Remove".
NOTICE
Keep all parts clean from contaminants.
--- Page 16 ---
Contaminants may cause rapid wear and shortened component life.
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Dispose of all fluids according to local regulations and mandates.
Illustration 1
g01337982
1. Remove bolts (1) that secure bypass tube (2) to front housing (3). Remove bypass tube (2)
from the cylinder head. Remove O-rings (4) and (5) from bypass tube (2).
--- Page 17 ---
Illustration 2
g01337985
2. Remove bolts (7), (8) and (9) from front housing (3).
Note: The bolts are three different lengths. Note the positions of the different bolts.
3. Remove front housing (3) from the cylinder block.
4. Remove joint (6).
--- Page 18 ---
Illustration 3
g01337987
5. Remove thrust washer (10) from the cylinder block.
--- Page 19 ---
Product: VIBRATORY COMPACTOR
Model: CS-76 VIBRATORY COMPACTOR CYX
Configuration: CS76 XT CP76 Vibratory Compactor CYX00001-UP (MACHINE) POWERED BY C6.6 Engine
Disassembly and Assembly
C6.6 Engines for Caterpillar Built Machines
Media Number -KENR6081-15
Publication Date -01/03/2014
Date Updated -04/03/2014
i02980900
Housing (Front) - Install
SMCS - 1151-012
Installation Procedure
Table 1
Required Tools
Tool
Part Number
Part Description
Qty
A
6V-6640
Sealant
1
B
-
Guide Bolt
(M8 by 80 mm)
2
C
319-6486
Alignment Tool
1
-
Bolts
(M10 by 50 mm)
3
D
-
Straight Edge
1
E
1U-6396
O-Ring Assembly Compound
1
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
1. Ensure that the front housing is clean and free from damage. If necessary, replace the front
housing.
--- Page 20 ---
Install blanking plugs to a new front housing. Use Tooling (A) to seal all D-plugs.
2. Check the condition of the crankshaft front seal. If the front seal is damaged, remove the
front seal from the front housing.
3. Clean all the mating surfaces of the cylinder block.
Illustration 1
g01337987
4. Install thrust washer (10) into the recess in the cylinder block. Refer to Disassembly and
Assembly, "Camshaft - Install" for more information.
--- Page 21 ---
Illustration 2
g01338000
5. Install Tooling (B) to the cylinder block. Refer to Illustration 2.
6. Align a new joint (6) with Tooling (B) . Install the joint to the cylinder block.
Note: Ensure that two circular tabs (X) on the joint are engaged in two holes (Y) in the
cylinder block.
--- Page 22 ---
Illustration 3
g01338001
Typical example
7. Install Tooling (C) to the cylinder block.
8. Install the front housing over Tooling (B) and Tooling (C) onto the cylinder block.
--- Page 23 ---
Illustration 4
g01338002
(7) M8 by 20 mm
(8) M8 by 35 mm
(9) M8 by 25 mm
9. Install bolts (9) to front housing (3) finger tight.
10. Remove Tooling (B) .
11. Loosely install bolts (7) and (8) . Refer to Illustration 4 for the correct position of the bolts.
12. Align the bottom face of front housing (3) to the lower machined face of the cylinder block.
Use a Tooling (D) and a feeler gauge in order to check the alignment between the front
housing and the cylinder block. Refer to Illustration 3. Refer to Specifications, "Front
Housing and Covers" for further information.
--- Page 24 ---
Suggest:
For more complete manuals. Please go to
the home page.
https://www.ebooklibonline.com
If the above button click is invalid. Please
download this document first, and then
click the above link to download the
complete manual.
Thank you so much for reading
--- Page 25 ---
Illustration 5
g01338003
13. Tighten bolts (7) , (8) and (9) in the sequence that is shown in illustration 5 to a torque of 28
N·m (20 lb ft).
Note: Ensure that the housing and the cylinder block are correctly aligned.
14. Remove Tooling (C) from the cylinder block.
15. If necessary, install a new crankshaft front seal. Refer to Disassembly and Assembly,
"Crankshaft Front Seal - Remove and Install".
--- Page 26 ---
Illustration 6
g01337982
Typical example
16. Install new O-ring seals (4) and (5) to bypass tube (1) . Use Tooling (E) in order to lubricate
the O-ring seals. Install bypass tube (2) to the cylinder head. Install bolts (1) . Tighten the
bolts to a torque of 22 N·m (16 lb ft).
End By:
a. Install the fuel injection pump. Refer to Disassembly and Assembly, "Fuel Injection Pump -
Install".
b. Install the timing gears. Refer to Disassembly and Assembly, "Gear Group (Front) - Install".
c. If the engine has an accessory drive, install the accessory drive. Refer to Disassembly and
Assembly, "Accessory Drive - Remove and Install".
d. Install the engine oil pan. Refer to Disassembly and Assembly, "Engine Oil Pan - Install".
e. Install the front pulley. Refer to Disassembly and Assembly, "Vibration Damper and Pulley
- Install".
f. If necessary, install the alternator. Refer to Disassembly and Assembly, "Alternator -
Install".
g. Install the fan. Refer to Disassembly and Assembly, "Fan - Remove and Install".
h. Fill the cooling system with coolant. Refer to Operation and Maintenance Manual, "Cooling
System Coolant - Fill" for the correct procedure.
--- Page 27 ---
https://www.ebooklibonline.com
Hello dear friend!
Thank you very much for reading.
Enter the link into your browser.
The full manual is available for immediate
download.
https://www.ebooklibonline.com
Comments