Uploaded on Jun 18, 2020
Do you know about Phases of Implementation? There are 5 phases in implementation. 1) Requirement gathering Phase 2)Blue Print Phase 3) Realization Phase 4) Test & Training Phase 5) Go live phase
Learn professional IT Courses Online in 35 Hours
Everything you need to know about ASIS
and TOBE Phases in Implementation
Do you know about Phases of
Implementation? There are 5
phases in implementation.
1) Requirement gathering Phase
2)Blue Print Phase
3) Realization Phase
4) Test & Training Phase
5) Go live phase
Lets study all these phases in details but before this do you know the answer of
following questions?
What is ASIS means the ERP before implementation?
What is TOBE means The ERP after implementation?
The process between these two known as Phases of implementation
Requirement Gathering Phase: In this phase, the basis consultant meets
IT manager/IT head for a discussion about the IP address required for SAP
Installation. During their visit, they open some of the port (Http 8080 https
443 smtp 25 in the firewall and check RTO(request time out). The IT manager
also analyzes the speed they have it for download & Upload and the storage
space need to be check and have a small meeting plan on DR Disaster
Recovery and check with backup plans or third party tools which are used by
them Redwood , Tivoli, Symantec backup solutions
Blue Print Phase: In this phase, the IT Manager puts all their collected
documents in place and they prepare some PPT on their understandings. After
that they prepare one master blue print for all modules and with all business
processes. In this way, they designed everything business process in the form
of PPT.
Realization Phase: In this phase the real work starts they put all ppt into
real scenario’s , the consultant starts configuration on Dev systems. This phase
is controlled by Project Manager’s who assign some task’s and time line to the
consultant and do follow up with them. This phase will take much time then
other phases ex:
Basis concerns:
a. The Project Manager will check hardware and ask for replacement of
hardware
b. He will ask for new consultant after building quality server
c. He will understand the business process and make role matrix with the help
of Functional Team
d. Need to work on pre-post steps of Quality server and create roles assigned
to user
e. Support Team Members for all activities related to basis
f. Build Prd server with all pre-post steps create all prd users and create roles
and assign them
g. Work with team in post go live support.
Training & Testing: The client will test all the processes regressively
without missing a single Tab. All radio buttons total flow of the process
checked by more than one user. If they found any issue they need get sorted
out in this cycle. During the Training & Testing phase ,they need train all the
persons about SAP and how to work in SAP from scratch.
What BASIS will do : He has built the Quality system well before the phase and
do all pre — post steps in the system create all test user and working with roles
also with the help of functional Team.
GoLive Phase: System goes live but here BASIS has to work more hours he
has built the Prd
Built production server install the production server download the software
from SMP install os then copy dumps to folder and start installation.. ECC
CRM SCM PI XI then to all pre-post steps in the server
Apply some patches recommended by SAP for some specific modules
Create N number of users and create roles for them and test all roles with
functional and assign to proper user then only handover system
Then he check the TMS config and move all request from Qua to Prd
Post go-live support : Whole team has to work extended hours and the
consultant will also learn many new things in this process with all new
industry standards.
To know more about phases of implementation please
visit https://rhsofttech.com/
Comments