Question: 1
Site selection is one challenge for the traditional data center
A. TRUE
B. FALSE
Answer: A
Question: 2
Unpredictable business, expansion and difficult investment is one of the challenges facing the
development of traditional data center business.
A. TRUE
B. FALSE
Answer: A
Question: 3
Which system affects the PUE most in Data Center.
A. Power Distribution system
B. Cooling System
C. N/A
D. Lighting system
Answer: B
Question: 4
Which one is the best PUE in the following:
A. 1.06
B. 2
C. 0.3
D. -0.5
Answer: A
https://en.wikipedia.org/wiki/Power_usage_effectiveness
Question: 5
Cold/Hot aisle containment is used to solve the problem of heat dissipation in Data Center.
A. TRUE
B. FALSE
Answer: A
Question: 6
Modular Data Center is on-demand deployment, which avoids over-investment.
A. TRUE
B. FALSE
Answer: A
Question: 7
Which Technologies or solutions can reduce PUE?
A. Increasing the number of access control systems
B. Efficient modular UPS
C. Cold/hot aisle containment
D. In-row cooling
Answer: BCD
Question: 8
FusionModule2000 is an outdoor smart modular data center solution.
A. TRUE
B. FALSE
Answer: B
FusionModule2000 is an indoor model
Question: 9
FusionModule1000 is an indoor prefabricated all in-one data center solution.
A. TRUE
B. FALSE
Answer: B
FusionModule1000A All-in-One Prefabricated Data Center is a green and reliable outdoor data center
solution.
Question: 10
FusionModule1000A series solution meets the TIER 4 requirements if it adopts 2N power supply and
distribution system.
A. TRUE
B. FALSE
Answer: B
(FM1000A does not support Tier 4)
Question: 11
Depending on different layouts, the batteries can be deployed inside or outside FusionModule2000
A. TRUE
B. FALSE
Answer: A
Question: 12
When ATS is in automatic mode, the handle for manual operation must be remove.
A. TRUE
B. FALSE
Answer: A
Question: 13
Smart Electricity meter of PDU8000 is abnormal, is it possible that:
A. The transformation ratio of current or voltage is incorrectly set.
B. Cables to the voltage collector are not properly connected.
C. The current transformer is faulty.
D. The smart electricity is faulty.
Answer: ABCD