Before a construction project begins, a BIM Execution Plan (BEP) should be prepared. This aids in the analysis of the various stages of the lifecycle of a building project. BEP, which is a thorough documentation, makes it easier for project team members to carry out the role that BIM plays in construction management.
Top 5 Benefits of BIM Execution Plan_
Top 5 Benefits of
B I M E X E C U T I O N P L A N
BRIEF ABOUT BIM
EXECUTION PLAN
• Before a construction project begins, a BIM Execution Plan
(BEP) should be prepared.
• This aids in the analysis of the various stages of the lifecycle
of a building project.
• BEP, which is a thorough documentation, makes it easier for
project team members to carry out the role that BIM plays in
construction management.
• It is frequently observed throughout a building project that
the implementation of the BIM plan gets buried in trivial
details.
• This makes it challenging to identify important data to
advance the projects and produce timely deliverables.
• A precise BEP makes it easier to maintain track of the
project teams, emphasize the important details, and save
time and money.
BENEFITS OF BIM EXECUTION PLAN IN A
CONSTRUCTION PROJECT
• Clear Communication
• Improved Collaboration
• Saving Construction Time
• Fast Data Sharing
• Robust Project Execution
@reallygreatsite
1. CLEAR COMMUNICATION
• A proper BEP supports communication
amongst project stakeholders from the
onset of the construction project.
• This facilitates project team members to
manage responsibilities and ensure clear
communications about the project
2. IMPROVED COLLABORATION
• Each project is different from the others and has diverse
requirements, regulations as well as the internal standards.
• Since a BIM execution plan is considered to be a breathing
document, the project team members collaborate in real time on
different project phases.
• This prevents silos among project tasks and allows proper
attention to the significant tasks.
3. Saving of Construction Time
• An obstacle that often arrives in a
construction project is a compressed
schedule.
• A well structured BEP emphasizes on
the benefits of the project.
• None is bogged down with the
provisions that may cause delay to the
project deliverables.
• As an alternative, the vital aspects are
executed, maintaining deliverable
schedule throughout the project.
4. Fast Data Sharing
• Transparency is a great advantage of the BIM execution
plan, as it is instantly available to all the project
stakeholders from the very beginning of the construction
project.
• As a result, contractors, owners, and others get direct
access to BIM data like file formats, dimensions, and
other details in a way that could be easily shared and
updated.
@reallygreatsite
5. Robust Project Execution
• An effective BIM Execution Plan focuses on
the project rather than every standard.
• Construction team members are able to
communicate and collaborate better from
the initial stage, ensuring a robust project
execution, facilitating project owners and
shareholders.
• Accomplishing this plan helps to keep the
building items accountable, ensuring
completion on time and as per budget.
TEJJY INC. – TOP BIM SERVICE
PROVIDER IN USA, DELIVERING
BEST GUIDE TO BEP
• Want stronger project execution, improved timelines and
happy project owners?
• Contact Tejjy Inc BIM consultants in USA at 202-465-
4830 or [email protected]
CONTACT US
Want stronger project execution, improved
timelines and happy project owners?
[email protected]
Call us now
202-465-4830
W W W . T E J J Y . C O M
THANKS
Comments