How to Demolish a Pool
How To Demolish a Pool
Drain the Pool
First step to any pool demolition is to drain the pool if it is
not already empty. It is easy to drain a pool by using a
submersible pump.
Punch Holes
Make sure that you do not
need any special permits
to demolish the pool.
Disconnect any gas lines
or electrical wiring. Jack
hammer large holes into
the bottom of the pool
about two feet in radius. A
typical pool will need about
three to four holes.
Remove the Wall
It is not easy to
break pool walls and
you may have to
bring in a jack
hammer to get the
job done. The top
two feet of concrete
and reinforced steel
will need to be
removed.
Backfill with Sand and Dirt
Fill the pool with sand and dirt. Then compact it down
periodically. Do some research on the soil in your area,
once you know what soil will work best, you can start
adding that soil until it is completely filled and compacted
up to grade level.
Add Topsoil
Make sure that the last couple of inches of the pool are
filled with topsoil. This step is especially important if you
are going to landscape or have a garden. The general rule
of thumb is for a vegetable garden you need 8-12 inches
of topsoil, raised plants need 12-18 inches of topsoil and a
lawn only requires 4-6 inches of topsoil.