The role of the steelwork draughtsman or detailer examined more closely. When the contract is placed with a structure steel fabricator, and assuming that the steelwork detailer works for the fabricator, their duties can be categorised as follows. for more details visit on: https://www.d05eng.com/
Function of the Structure Steel Detailer
Function of
the Structure
Steel Detailer
Follow
us:
The of the steelwork draughtsman or
role examine more closely. When the
detailer dis with a structure
fcaobnrtircactot r, palancde dassumsintege lthat the steelwork
detailer works for the fabricator, their duties
can be categorised as follows.
The first function is to prepare a list of steel
materials from the layout drawings provided by
the consulting engineer, enabling the
contractor to reserve the items from stock or
to place orders with steel merchants or steel
mills.
The detailers proceed with the preparation of the steel
detailing drawings, providing an accurate representation of
components of structures, namely, beams, girders, ,
columns, bracings, stairways, platforms, rails, brackets,
girts, purlins, etc., and where other structures such as
bridges, towers, tanks, etc., are involved, these will follow
broadly the same pattern.
An experienced senior detailer must carefully supervise
drawings and carefully scrutinize them as a checker. It is
essential to correct the errors at this stage, as the
correction of errors during fabrication in the shop or
during erection on site will be infinitely more expensive.
Draughtsmen should be critical of their own work
subconsciously acting as their own checker, to ensure that, to
the best of their ability, their drawings are error-free.
The detail drawings are sent to the fabrication shop, where
work is put in hand, drawing the material from stock,
cutting it to exact length, drilling or punching the
necessary holes and assembling the various parts by
means of bolting or welding to make up the components
or subassemblies ready for transport to site.
.
The drawing office, whether using a manual system or
computer aided facilities, must now proceed with the
preparation of erection drawings, showing steel framework
in skeleton. These drawings should be checked by the
senior detailer and endorsed by a qualified structural
engineer. The steel detailing services erector will refer to
these drawings for the assembly of the structure on site.
The position of each component is identified by a
distinguishing erection mark. In the fabrication shop, such
erection marks are hand- marked, painted or tagged onto
the steel components.
All drawings are updated to incorporate any revisions
that have occurred during the progress of the job and a
complete set of prints is handed to the engineer for
filing. These serve as a record of the work and are useful
for future reference
Undoubtedly, we have seen great change and growth over
the past 20 years. I am very much confident about that
the years ahead will be just as remarkable.
I thank D05 Design and engineering staff past and present
for being part of the growing D05 family and for their
efforts and their contributions
Contact us
Website: d05eng.com
Address:186 Seven Farms Dr,
Suite F, Box 301
Phone No. +1 (843)-474-
3034
Comments