Concrete stair construction includes steps such as design, foundation preparation, formwork construction, rebar installation, concrete pouring, finishing and curing. Concrete stair construction is a difficult task requiring technicians to study and design all aspects and skilled workers to build them.
How to Construct Concrete Stairs
HOW TO
CONSTRUCT
CONCRETE
STAIRS?
Concrete stair construction includes steps such as
design, foundation preparation, formwork
construction,rebar installation, concretepouring,
finishing and curing. Concrete stair construction is a
difficult task requiring technicians to study and design
all aspects and skilled workers to build them.
DESIGNING OF CONCRETE STAIRS
Factors that affect stair design include floor height,
stair width, riser depth, screw width, stair thickness,
stair angle, and load on the stair. Other aspects
require a qualified engineer to design the perfect
staircase.
CONCRETE STAIR FOUNDATIONS CONSTRUCTING CONCRETE
AND SUPPORTS STAIR FORMWORK
The foundation on which the concrete stair The most important step in constructing
rests must be properly designed to transfer concrete staircases by using the correct
the load of the stair well to the ground and formwork. Flight angles, sleds, and riser
to withstand the movement of the stair. If dimensions should be properly checked.
the foundation beam of the building is at Usually, when building a wall-fixed
the start of the stairs, load-carrying rebar staircase, walking lines, threads.
can be attached to it.
CONCRETE POURING OF CONCRETE STAIRS
Concrete stairs must be reinforced with rebar to support
and transfer the loads acting on the stair to the ground.
The number of reinforcing bars and the size of the
reinforcing bars should be calculated by the structural
engineer according to the loads acting on the stairs.
REMOVAL OF
Strip afterF 2O1R daMysW aOs iRt tKakes at least 21 days for the stairs
to dry completely. To avoid cracking of the stairs due to
thermal expansion, proper curing should be done during
these 21 days.