Uploaded on Jun 24, 2021
Silicon Engineering Consultants Pty Ltd is a key engineering consultant organization expert in 2D and 3D designing for the verticals of Architecture, Engineering, and Construction.
Importance of BIM for steel detailers
Importance of
BIM for Steel
Detailers
Introduction
Structural steel detailing is a critical part
of the construction that is used for
residential, commercial and industrial
buildings. Steel detailing plays a vital role
in the construction life cycle, therefore
everyone from contractors, fabricators,
engineers and architects use it. Structure
steel detailing, erection drawings and
shop drawings work as a guide for the
faster and smooth construction.
2
FR
Naturally, these drawings require attention
and coordination, and that is where
BIM modelling services comes in light.
The 3D model helps steel detailer
communicate, visualize and analysis with
everyone involved in the building project.
They can explore the different
construction options and even at the early
stage, they get a clear insight into the
building.
BIM modeling is beneficial in every aspect of construction. FR
Some of the BIM benefits are:
Better collaboration and communication
Model based cost estimation
Preconstruction building visualization
Improved coordination and clash detection
Reduced cost and mitigated risk
Improved construction scheduling
Higher productivity and prefabrication
Safer construction sites
Better and faster construction
Better material and equipment management
FR
Building Information Modeling is an excellent communication tool
for the multi-level construction process. The model is used for
detecting early-stage clashes when data from different disciplines
including architectural, MEP and structural are combined. As a
result, the BIM data forms a solid base for eliminating the chances
of rework, bringing down the cost, bidding and planning.
FR
Detailers are switching to 3D steel detailing solution as it can save lots of time and
money. A lot of repetitive detailing work is automated allowing you to focus on
things that need more attention and accuracy. BIM model guarantees a single
model from start to end and allows the detailers to be more adaptable to any
changes easily.
LOD shows the quantity of information in the Building Information Modeling.
Level of detailing begins with LOD 100 that is the conceptual drawings and it goes
up to LOD 500. Steel detailers require at least LOD 400 level of development to get
full information about nuts and bolts that are ready for fabrication and erection.
By using BIM software, they can get the LOD 400 data that is even helpful in post-
construction as well.
Building Information Modeling
Our Building Information Modeling has the following FR
information about the steel detailing:
Size
Dimensions
Material requirement
Surface specification
Welding
Bolting
Fabrication instruction
Silicon Engineering Consultants Pty Ltd has years of
expertise, strategic plans and time management to
offer the best BIM modeling services in the
construction industry today. We have skilled teams
of BIM modeller who use the latest software to
create BIM models of any complexity.
Contact Us.
Silicon Engineering Consultants Pty Ltd
+61-431-334-750
[email protected]
www.siliconec.com.au
Comments