The type of product your epoxy flooring contractor use will also affect the curing time. Many people also believe that if you maximize ventilation, the epoxy floor coating will dry fast. But again, this may not hold true in all circumstances. If you are looking for the best epoxy flooring contractor in Melbourne then visit our website. Read more:https://tuffbuild.blogspot.com/2021/12/how-long-does-epoxy-coating-take-to-cure.html
How Long Does Epoxy Coating Take to Cure
WELCOME
TO
How Long
Does Epoxy
Coating Take
to Cure?
Out of many queries, this is the most widely asked by the clients – What is the Epoxy Cure Time?
Well, such questions are usually asked to the epoxy flooring contractors in Melbourne. But you
may not get what you are looking forward to. The simple and straight forward answer to this
question is seven days. It means that it takes a week for the final epoxy coating to completely
get harden. But if we talk about the drying of the epoxy coat, it usually happens overnight. Yet
again this is not the case with all epoxy coatings. For instance, if you are using water-based epoxy
or solvent-borne epoxy (the stuff smells strong), and you could even have a higher or lower
percentage of solids. It can take longer to dry. Since the epoxy cure time is of seven days, there
can certainly be some variations. Like your floor may get dry enough to walk on it immediately
after 12-hours or so and may also get ready for light uses after 24 hours. But wait, this time
frame is not applicable to all the places. For example, the colder and less humid an environment,
the longer will the process of epoxy coating the floor. At a temperature of 25 degrees Celsius
and 60 per cent humidity, you may be able to keep back the furniture and other items back onto
the floor in two or three days.
Above was the case with the epoxy flooring coating inside the residential or commercial building.
If the epoxy floor work takes place outdoors, the time will have to be planned as per the weather
conditions. Then your floors would require consecutive days of fine weather to dry up quickly. In
case, rain is predicted, or any other untoward weather conditions seem to take place, be patient
because your epoxy flooring contractor
Type of Product Affects
Epoxy Curing Time
The type of product your epoxy flooring contractor in
Melbourne
use will also affect the curing time.
Many people also believe that if you maximize
ventilation, the epoxy floor coating will dry fast. But
again, this may not hold true in all circumstances.
You may end up creating a humid environment instead.
There are epoxies which are ‘moisture-cured,’ which
means they would require moisture and heat to
harden and dry up.
This is the major reason- In the places which have hotter
climate, the epoxy floor coatings can be applied in the
day time in which the concrete cools down around mid-
afternoon. If epoxy is coated to the concrete which is
warming, it can cause a lot of issues.
Here’s How You Can Speed
Up the Epoxy Curing
Process
Based on the epoxy product your epoxy flooring
contractor uses, you will be able to speed up the drying
time- either by creating a humid, or warm environment,
as already explained above.
There are epoxy products that dry really fast. Such
products are expensive and also require significant
number of people to control the epoxy application
process.
Such fast-drying epoxies are made for the areas that
receive heavy traffic, or cold areas where fridges are
kept; commercial kitchens or the businesses that
cannot bear any financial loss.
The speedy drying of epoxy sounds good but you can
even end up serious issues later on. For example, if you
had a sub-standard concrete slab and on the day of
pouring concrete, if it turns out to be cold, the working
time with the concrete may increase.
In the worst-case scenario, a fast-drying epoxy-based
product will not be able to build a grip on the surface
because it would need slower processing time.
Components of Epoxy
Most epoxies are made of two
components: Part A (resin) and
Part B (hardener)
The two components should be linked with each other
and must be concrete so as to build a bond.
If the quality of concrete is compromised, and fast-drying
product is also used, the results will get affected. Within
months, the coating will tear off and you may have to do
it.
Haste Makes Waste – Abide by this rule because if you
really do not need the floor so urgent, then let the epoxy
coating process go naturally.
If you wait, chances are extra time will be worthwhile.
If you are deciding to get the epoxy floor done, it is
advised to check the products with a critical eye. Here's
one truth, you may not get any reply from your epoxy
flooring contractor. But if you take services from one of
the best epoxy flooring contractors that is Tuff Build,
your every doubt and query will be answered.
Time You Need to Wait for New
Concrete?
Normally, the concrete slab requires at least 28-days
before coating. Even almost after a month, the moisture
will be tested to ensure that the concrete is ready for
coating.
This rule is general, but rest of the variables will be
played with like; The thickness of concrete
Curing conditions
Components used in the concrete
The type of coating to be used on the concrete
Who’s the Main Culprit?
Moisture is main culprit. This is what the experts would
want right out of the slab.
Slabs may have excess moisture for multiple reasons. A
moisture vapor treatment or barrier can also be applied
to counteract it. This treatment prevents moisture from
rising within the slab. Also, it can withstand huge
amounts of water pressure.
If your concrete slab gets a coating that completely
seals the surface, the water pressure (also called
hydrostatic pressure) may build up and rip through
epoxy coat.
Investing in moisture treatment is crucial. In reality,
moisture issues represent less than 5% of the entire
work. You may even require the assistance of water
proofing specialists.
If you are someone who is looking forward to getting
epoxy floor installed, contact Tuff Build, the best
epoxy floor contractors.
Get In Touch
5 Lord Place, Point Cook, Vic, 3030
+61 432 521 274
[email protected]
Content Resource:
htt
ps://tuffbuild.blogspot.com/2021/12/how-long-does-epoxy-coating-take
-to-
cure.html
Comments